Sunday, December 21, 2008

Frame 90% complete

Update: The frame is almost complete, all that is left to do is install the braces that will hold them in place, dill holes for the gear train, and installing the idlers.

The steering is provided by a single servo located at the front. The battery will be placed on a holder which will be then fixed on the servo arm.

No comments: